Remote shaft lining

Development

The remote shaft lining equipment is the result of 7 years of development, it's purpose-built to eliminate the need of workers in the shaft.

Capacity

The equipment is designed to operate in areas between 2.5 to 6 meters in diameter and 350 meters depth.

How it works

The shotcrete robot is lowered in the raise bore shaft and the application of wet shotcrete is transported to the spray nozzle where it is mixed with shotcrete accelerator and sprayed onto the shaft wall.